Dose continuously into the feedwater storage section of the deaerator so the product has contact time before the boiler. As a starting point, hold a small measurable reserve at the economiser or boiler inlet and adjust to site conditions — make-up rate, deaerator performance and operating pressure all change the demand. Verify with routine dissolved-oxygen and scavenger-reserve tests and let our technical team review the results for your plant.
Product